Hammer down any large nails that are exposed by the removal.
Gazebo roof drip flashing installation.
Please like and subscribe for more instructional videos.
Flashing is installed to surround roof features such as vents chimneys and skylights.
A t shaped drip edge flashing is.
Water should run down the side of the flashing and be directed to the shingles instead of finding its way into the roof deck.
Align the step flashing with the leading edge of the starter course and nail it in place using one nail in the upper corner.
Inspect the underlying roof sheathing for damage and make any needed repairs.
It is also sometimes called d metal for drip.
Install a layer of roofing insulation as recommended by the roofing manufacturer.
The drip edge should be installed on top of the underlayment at all rakes and below or on top of the underlayment at the eaves.
T shape drip edge is an l shaped flashing in which the long leg folds back on itself before heading down 90 degrees to form the short leg.
At the eaves when installing the drip edge on top the underlayment a 4 inch wide layer of asphalt roof cement complying with the astm d4586 type i or type ii is required.
L shape drip edge is a simple 90 degree bend with a flare out at the bottom of the short leg.
In today s video we go over the basic techniques to installing drip edge and rake edge on your roof.